One-Point Radon Mitigation System Installed in North Haven

Before

The home tested at 8.9 pCi/L, above the EPA's recommended action level of 4.0 pCi/L. The existing sump pump was sealed, but the surrounding WaterGuard was discussed as an area to address to help reduce potential pathways for soil gas entry.

After

A one-point radon mitigation system was installed with a Festa Hawk fan. The extraction point was placed near the sump, and the exterior piping was routed out the back of the home. Sealing the WaterGuard remains an important consideration. Follow-up radon testing is recommended to confirm the system's performance.

Two-Pipe Radon Mitigation System Installed in Branford Home System Exit

Before

The exterior of the home had no radon mitigation system in place, with no visible piping along the siding.


After

A radon mitigation pipe was installed and routed out the right side of the home, vented above the roofline.

Two-Pipe Radon Mitigation System Installed in Branford Home Mechanical Room

Before

The mechanical room had no radon mitigation system in place, with limited space available for installation.


After

 

A two-pipe radon mitigation system was installed within the mechanical room, carefully routed to fit the tight space while maintaining proper airflow.

Radon Mitigation System Installed in Guilford Home Office Basement

Before

The home had a radon level of 6.9 pCi/L with no mitigation system in place. The basement was being used as a home office area, increasing the importance of improving indoor air quality.


After

 

A one-pipe radon mitigation system was installed near the boiler closet and routed through the drop ceiling to the exterior for effective radon reduction.

Radon Fan Installation in Madison

Before

The home was scheduled for a radon fan installation using a FanTech fan ordered specifically for the project. The existing setup was reviewed before completing the work.

After

The FanTech fan was installed as planned. No unexpected changes to the job were reported, and the installation was completed without a need for additional follow-up.