Radon Mitigation Photo Album: Two-Point Radon Mitigation System Planned for Southington
The planned two-point system will draw soil gas from beneath the home's single foundation using extraction locations near the well tank and sump pump. The sump pump will be sealed, and the PVC piping will be routed across the area before exiting near the sump. A Festa Hawk fan will provide the suction needed to move radon gas safely outdoors.
Basement Piping Layout
The basement view shows the planned PVC piping route through the utility and storage area, connecting the extraction system while working around the existing equipment and ceiling utilities.
Sump Pump Area and Extraction Point
This view shows the sump pump area and nearby PVC piping. The sump will be sealed as part of the mitigation work, with an extraction point planned nearby.
Interior PVC Pipe Routing
The PVC piping is routed through the basement storage area and along the ceiling, helping connect the extraction locations to the exterior portion of the system.
Exterior Fan and Vent Pipe
The exterior installation shows the Festa Hawk fan and vertical PVC vent pipe mounted along the side of the home, carrying collected soil gas upward and away from the living space.
Exterior Pipe Exit Location
This exterior view shows the area where the radon mitigation piping exits the home near the foundation, providing the transition from the basement system to the outdoor venting route.