Efficient One-Pipe Radon Mitigation in 1920 Hamden Colonial

Before: Elevated radon at 4.0 pCi/L in a 1920 colonial with no major structural complications—no cracks, sump pump, or crawl spaces.


After: Seamless one-pipe mitigation system installed through the Bilco entrance, with pipe run optimized for long-term radon reduction. Historic charm meets modern health standards.

background